Home Our Projects: Completed Projects
  • Nazilli-İzmir-Natural Gas Pipeline, Field Survey, Land Expropriation, Engineering 227 km – 2006
  • Doğu Karadeniz (Gümüşhane-Bayburt-Trabzon-Rize) Natural GasTransmission Line, Field Survey, Land Expropriation, Engineering 305 Km. 2004
  • Düzce-Bolu-Gerede-Nevşehir -Natural Gas Pipeline, Field Survey, Land Expropriation, Engineering 200 Km. 2005
  • Bakü-Tiflis-Ceyhan Raw Oil Pipeline, Field Survey, Land Expropriation, Engineering 178 Km. – 2003
  • Bozüyük-Seçköy, Yumurtatepe-Seçköy, CS3-Muallim, Aliağa, increasing the capacity of Pig Transmission Line Project, Field Survey, Mapping, Land Expropriation, Engineering 130 Km – 2008 (on behalf of Atilla Doğan (AD) Inc.)
  • Türkiye-Yunanistan Natural Gas Transmission Line, Field Survey, Mapping, Land Expropriation, Engineering 267 Km – 2004 (on behalf of AND Mühendislik.)
  • Konya – KaramanNatural Gas Transmission Line, Mapping, Land Expropriation, Engineering 196 Km – 2003 (on behalf of Çolakoğlu İnşaat).
  • Konya-Isparta Doğal Natural Gas Transmission Line, Mapping, Land Expropriation, Engineering268 Km 2003 (on behalf of Çolakoğlu İnşaat).
  • Balıkesir-Manisa Susurluk-Akhisar Natural Gas Pipeline, Field Survey, Land Expropriation, Engineering34 Km 2002 (on behalf of Günsayıl İnş. Ltd. Şti.)
  • Yapracık-Sincan, Yapracık-Ostim Natural Gas Transmission Line, Mapping, Land Expropriation, Engineering 35 km, 2002 (on behalf of ZORLU Enerji).
  • Bozüyük-AdapazarıNatural Gas Pipeline, Field Survey, Mapping, 63 Km 2000 (S.T.F.A. AŞ. Adına yapılmıştır)
  • Çan-Çanakkale Natural Gas Pipeline, Field Survey, Mapping, Land Expropriation, 130 Km – 1999 (on behalf of Günsayıl İnş. Ltd. Şti.).
  • Eynesil (Giresun) Digital Topographic Map 1258 Hectare 2005
  • Terme (Samsun) Digital Topographic Map 1640 Hectare 2004
  • Işıklar (Trabzon) Digital Topographic Map 300 Hectare 2000
  • Çayıryolu (Bayburt) Digital Topographic Map 650 Hectare 2000
  • Bayburt (Merkez) Digital Topographic Map 3250 Hectare 2000
  • Taşkıran (Trabzon) Digital Topographic Map 380 Hectare 2000
  • Güneysu (Rize) Digital Topographic Map 950 Hectare 1998
  • Tirebolu (Giresun) Digital Topographic Map 810 Hectare 1998
  • Bahçe [Adana] Digital Topographic Map 935 Hectare 1997
  • Çukurçayır (Trabzon) Digital Topographic Map 583 Hectare 1997
  • Ünye (Ordu) Digital Topographic Map 1380 Hectare 1996
  • Yeşilyurt (Trabzon) Digital Topographic Map 730 Hectare 1996
  • Köşebucağı (Ordu) Digital Topographic Map 325 Hectare 1995
  • Yoncalı (Muş) Digital Topographic Map 585 Hectare 1990
  • Fatmalı (K.Maraş) Digital Topographic Map 690 Hectare 1990
  • Erzurum (Merkez) Digital Topographic Map 2850 Hectare 1989
  • Düzköy (Trabzon) Digital Topographic Map 650 Hectare 1989
  • Çaykara (Trabzon) Digital Topographic Map 165 Hectare 1989
  • İyidere (Rize) Digital Topographic Map 540 Hectare 1989
  • Söğütlü (Trabzon) Digital Topographic Map 875 Hectare 1989
  • Border of Kırşehir-Kaman) Ayr.-4.Bl.Highway, (Kayseri-Sivas) Ayr.-Bünyan-Köprübaşı Provincial Roads, Kazankaya-Ortaköy Provincial Roads, Bor-Altunhisar Provincial Roads,(Kayseri- Pınarbaşı) Ayr.-Tomarza Provincial Roads andKırşehir Güney Highway Immovable Asset Evaluation 2013
  • Erzurum-Artvin-Çamlıbel Highway Immovable Asset Evaluation 2012
  • Tortum-Artvin Ayrımı-Serdarlı Provincial Roads Immovable Asset Evaluation 2011
  • Çanakkale-Ezine-Ayvacık Highway Immovable Asset Evaluation 2011
  • (Türkeli-Ayancık)-Erfelek-(Sinop-Boyabat) Ayr. Highway Immovable Asset Evaluation 2011
  • Trabzon-Yomra Ayrımı-Bulak Çağlayan Provincial Roads Immovable Asset Evaluation 2011
  • İznik Mekece Highway Immovable Asset Evaluation 2010
  • Boğazlıyan-Sarıkaya-Sorgun Highway Immovable Asset Evaluation (3 different road) 2010
  • Topaklı-Kozaklı Provincial Roads Immovable Asset Evaluation 2010
  • Develi-Tomarza il yolu Immovable Asset Evaluation 2010
  • Sorgun-Akdağmadeni Highway Immovable Asset Evaluation 2010
  • Bakırdağ-5.Bl.Hd. Provincial Roads Immovable Asset Evaluation 2010
  • Develi Bakırdağ Provincial Roads Immovable Asset Evaluation 2010
  • Ankara-Çankırı Ayr. Immovable Asset Evaluation Services (Ankara-Çankırı) Ayr.- 7.Bl.Hd..-İskilip D.Y. Ve 4.Bl.Hd.-Şabanözü-Eldivan-Çankırı Provincial Roads 2009
  • Silifke-Taşucu-Aydıncık-Anamur-13.Bl.Hd. Highway 2.Kısım Immovable Asset Evaluation Services (Km:166+105-171.785,171+740-176+120,213+146-247.223) 2009
  • Silifke-Taşucu-Aydıncık-Anamur-13.Bl.Hd. Highway 1.Part Immovable Asset Evaluation Services (Km:105+417-115+861,128+800-140+045G/142+000İ,158+779-166+105) 2009
  • Antakya-Reyhanlı – Cilvegözü Highway Immovable Asset Evaluation Services 2009
  • Kadirli-Andırın Provincial Roads Immovable Asset Evaluation Services 2009
  • Tavşanlı-Emet-Simav Highway 1.Kısım Immovable Asset Evaluation Services (Km:0+016.19-49+900) 2009
  • Bursa Bölge Dahilindeki Muhtelif Yollarda Immovable Asset Evaluation Services 250 km 2008
  • Çerkeş-Kurşunlu Ayr.-Orta-Şabanözü Provincial Roads Immovable Asset Evaluation Services Km:00+000-49+025 Arası – 2008
  • Kastamonu-İhsangazi ve Çaycuma-Perşenbe-Kozcağız-Bartın Immovable Asset Evaluation Services
  • Kastamonu-İhsangazi Provincial Roads Km:10+000-27+500
  • Çaycuma-Perşenbe-Kozcağız-Bartın Km:9+114-25+000 (Perşenbe-Kozcağız arası) 2008
  • İstanbul-Bursa-Balıkesir-İzmir Highway Immovable Asset Evaluation Services (Bursa-Karacabey ayr.-Susurluk Kesimi) 41 Km – 2009 – 2010
  • Trabzon Province 34. Group Digital Cadastral Mapping 2010
  • Trabzon Province 33. Group Digital Cadastral Mapping 2010
  • Trabzon 31. Group Digital Cadastral Mapping 5.100 Parcel – 2008
  • With credit form World Bank, Trabzon 27. Group Digital Cadastral Mapping 55,000 Parcel – 2007
  • With credit form World Bank, Trabzon 28. Group Digital Cadastral Mapping 10,500 Parcel – 2007
  • Gümüşhane Province 2. Group Digital Cadastral Mapping 24.650 Parcel – 2006
  • Gümüşhane Province 3. Group Digital Cadastral Mapping 21.000 Parcel – 2006
  • Agricultural Reform Implementation Project, Konya Province 1. Group Digital Cadastral Mapping 42000 Ha – 2005
  • Gümüşhane Province 1. Group Digital Cadastral Mapping 9.800 Parcel – 2005
  • TERME (Samsun) Digital Cadastral Mapping, Engineering Services 1640 Hectar – 20
  • EYNESİL (Giresun) Digital Cadastral Mapping, Engineering Services 1258 Hectar – 2005
  • Land expropriation and updating information Harran-Akçakale-Urfa Urfa Plains, 96.000 Hectar – 1993
  • Water Level Detection for Köse Dam, 1150 hectar – 2001
  • Mapping Services for Recreation Area in Zigana Forest 1150 hektar – 2001
  • Photogrammetric flight and lidar measurements for Western (Ankara-Bulgaria border) and Eastern (Ankara-Georgia boder) part of Nabucco Natural Gas Pipeline Project.

Within scope of ITE Natural Gas Pipeline Project;

  • Design studies,
  • Supervising services were carried out ,
  • Specification of construction materials was prepared,
  • General design for Compressor Station and hydraulic studies,
  • Plan of general settlement of electrical, safety and telecommunication was prepared,
  • Technical integrity of the pipeline and hazop studies were carried out.

Within scope of ITE Natural Gas Pipeline Project;

  • Offshore pipeline design (2x19km)
  • As a result of risk-based design studies, constuction and operation designs for offshore crossing (2X36″ Diameter) with no adverse effect on environment.

Within scope of ITE Natural Gas Pipeline Project;

  • FEED Design studies,
  • Design studies for compressor stations,
  • The studies were conducted related with the high heat values of the gas emitted from compressor station. As a result, it was thought that it can be possible to generate around 200-300 Megawatt electrical energy with transforming of this high value heat.
  • Feasibility studies were carried out.
  • Cadastral Renewal and Land Registry Automation Project