Karsantı HEPP Project
For the project, whose construction and operation belong to our company, and which is expected to produce 12 million kW electricity annually with approximately 6.5 MW installed power within Trabzon Province Araklı District borders, on Toroslu river the following works have been commenced and the total cost of the project is 8.5 million dollars: obtaining EIA, ESIA reports, construction, mechanical, electrical final designs, energy transmission line projects and displacements, ground surveys, geotechnical drillings and preparation of construction application designs.Our Regulator and HEPP projects, which are carried out over Ulu Enerji Elektrik Üretim A.Ş , which is a subsidiary of Sebat proje.